Why: The pedestrian connectivity gap along Buice Road (from Spruill Road to Haverhill Lane) is the fifth prioritized section based on the City’s Sidewalk Policy, which considers proximity to schools, parks, activity centers, accident history, cost, and if sidewalk exists on at least one side of the street. Additionally, once the Buice Road Bridge is replaced (which will adding pedestrian connectivity over Johns Creek), and once sidewalk is added along Buice Road from Twingate Drive to Kingston Crossing, this project will create a complete pedestrian connection from Old Alabama Road to Spruill Road.
What: The project would add a trail (wide sidewalk) on Buice Road (between Spruill Road and Haverhill Lane).
TSPLOST II Funds: $500K
Total Project Cost Estimate: $2 million ($1.5 million funding to be determined)
Next Step: Engineering to begin in 2022
Public Input Meeting Presentation: Meeting Presentation [PDF]
Buice Road Trail Concept: Concept [PDF]
Public Input Online Form: Submit your input
Map: