Buice Road Sidewalk (from Twingate Dr to Kingston Crossing)

Why: The pedestrian connectivity gap along Buice Road (from Twingate Drive to Kingston Crossing) is the fourth prioritized section based on the City’s Sidewalk Policy, which considers proximity to schools, parks, activity centers, accident history, cost, and if sidewalk exists on at least one side of the street. Additionally, once the Buice Road Bridge is replaced (which is in the engineering stage and includes adding pedestrian connectivity over Johns Creek), this project will be the last gap to form a complete pedestrian connection from Old Alabama Road to Johns Creek. 

What: The project would add a sidewalk on Buice Road (between Twingate Drive and Kingston Crossing). 

TSPLOST II Funds: $650K 

Total Project Cost Estimate: $650K 

Next Step: Engineering to begin in 2022