Why: The pedestrian connectivity gap along Barnwell Road (from Rivermont Parkway to North Peak Drive is the third prioritized section based on the City’s Sidewalk Policy, which considers proximity to schools, parks, activity centers, accident history, cost, and if sidewalk exists on at least one side of the street.
What: The project would add a trail (wide sidewalk) on Barnwell Road (between Rivermont Parkway and North Peak Drive).
TSPLOST II Funds: $3.4 million
Total Project Cost Estimate: $3.4 million
Next Step: Engineering to begin in 2022
Map: